The second carriageway on the Słupsk bypass, forming part of Task 1 of the project entitled ‘Construction of the S6 expressway on the Słupsk–Bożepole Wielkie section’, involves the construction of a northern carriageway to connect with the existing Słupsk bypass. The total length of the bypass under construction is 9.510 km and comprises the following sections:
In addition, the southbound carriageway will be widened to 10 metres.
Length of the section: 9.5 km